General plumbing – site arrival, material handling, access and work on roofs, trenching, drain camera use, roof and subfloor voids, installation pipework e.g. sewer.
- Pre job planning
- Arrival on site
- Site specific risk assessment
- Tools and material unloading
- Work area set up
- Use of hand and power tools
- Unloading equipment and materials
- Housekeeping of work area
- Excavation works on site
- Installation – drainage, sewer, water, gas
- Roof access and work – long duration
- Roof access and work – short duration
- Walking on roofs
- Confined spaces e.g. roof cavities
- Drain inspection camera
- Site pack up